Projects Completed

COMPLETED/IN-PROGRESS PROJECTS OF MEC ENGINEERING COMPANY (CIVIL)

Sr. Construction Activities Client Year
· Construction of Well Location & Access Road at Nurpur-1 Distt. Chakwal, Punjab, Pakistan. Shell Exploration Pak Ltd. 1997
· Construction of Well Location & Access road at Hattango-1 near Khipro, Dist. Sanghar Sindh, Pakistan. Premier Exploration Pakistan Ltd. 1997
· Construction of Well Location & Access road at Dulijan-1 near Kot Lalu, Dist. Nawab Shah, Sindh, Pakistan. B.G. Int. & Parker Drilling Co. Int’l. 1997
· Construction of Well Location & Access road at Zamzama-1, Dist. Dadu, Sindh, Pakistan. B.H.P. Petroleum Australia & Premier Exploration Pakistan Ltd. 1997
· Construction of Well Location & Access road at Kharhank Well-I, Jacobabad, Pakistan. Hycarbex Inc., Pakistan Ltd 1997
· Construction of Well Location & Access road at Zamzama 2A at Dadu. Sindh BHP Petroleum. Pakistan 1997
· Construction of Well Location & Access road at Zamzama 2B at Dadu. Sindh BHP Petroleum Pakistan 1999
· Construction of Well Location and Access Road at Hasan Well X-1, Block-2768-3 (Block-22). Sikarpur Pakistan Petroleum Limited.  Pakistan 1999
· Construction of Well Location and Access Road at Andher Well # 1 Baluchistan, Kirthar West Block for Lasmo Oil Pakistan Limited Lasmo Oil Pakistan Limited 1999-2000
· Preparation of Well Site/Camp Area for Dhurnal-6 Work over & Additional Works. Orient Petroleum Inc 2000
· Construction of Access Road and well location for SABZAL Well # 1, District Rahim Yar Khan, Block 2869-8. Polish Oil Gas Company 2000
· Maintenance Contract of SABZAL # 1,

ACCESS ROAD, WELL & CAMPSITE

KRAKOW 2000
· Construction of the Mosque at Bahngali, Orient Petroleum Inc. 2000
· Access Road, and Well & Camp Site Construction Mubarak-1Sindh PETRONAS CARIGALI Pakistan 2001
· Construction of Well Site and Access Road, Adhi Well –13, Tehsil Gujar Khan, District Rawalpindi

 

Pakistan Petroleum Limited.  Pakistan 2001
· MUBARAK-2 (KUSHBAKHT-1), ACCESS ROAD AND WELL SITE CONSTRUCTION

 

PETRONAS CARIGALI Pakistan 2001
· Supply of Drilling Rig Crew Great Wall Drilling Company of China at Adhi-13, Drilling Project of PPL

 

Great Wall Drilling Company 2001
· Federal Shariat Court

Construction of Blacktop Road 20 KM

Federal Shariat Court

 

2001
· Construction of Waste Water Pit at Dhulian 17.

Main Produced Water at Dhulian including Laying of Geo Membrane liner

Pakistan Oilfields Ltd. 2002
· Upgrading of Well Site and Camp Site at Zamzama – 3 BHP Petroleum. Pakistan 2002
· Construction of Bioremediation Plant     02 Nos. BHP Petroleum. Pakistan 2002
· Construction of Well Site, Camp Site, and Access Zamzama – 4 BHP Petroleum. Pakistan 2002
· Construction of Well Site, Camp Site, and Access Zamzama – 5 At Zamzama Gas Field near Johi Dadu – Sindh BHP Petroleum. Pakistan 2002
· Construction of Well Site Zamzama – North # 1 At Zamzama Gas Field near Johi Dadu – Sindh BHP Petroleum. Pakistan 2002
· Construction of Well Site Zamzama 6 At Zamzama Gas Field near Johi Dadu – Sindh BHP Petroleum. Pakistan 2002
· Supply & Installation of Water Wells & Zam-3 & North-1

At Zamzama Gas Field near Johi Dadu – Sindh

BHP Petroleum. Pakistan 2002
· Access Road and Well Site Construction Mehar –01, Near Mehar Faridabad near Larkana PETRONAS CARIGALI (PAKISTAN) LTD 2002
· Construction of Drilling Location & Access Road Usman-1 Sindh Orient Petroleum Inc 2003
· Construction of Well & Camp Site Ramzan-1 at Chokhan near Shanghalu Zob Baluchistan Paige Limited 2003
· Construction of Drilling Location & Access Road Tuba Deep Well-1 Orient Petroleum Inc 2004
· Construction of Black Top Road for Army Housing Society (GHQ), at Askari-XI, Cobbe Lines Rawalpindi ADH 2004
· Restoration of Well & Camp Site Khasarwari – 1 Khairpur Sindh OMV G.m.b.H 2004
· Restoration of Well & Camp Site Gambat-1 OMV G.m.b.H 2004
· Restoration of Well & Camp Site Gujwaro-1 OMV G.m.b.H 2004
· Miano, Sawan, Gambat and Miano South West II Fields.

Construction of Access Roads, & Well Locations

OMV G.m.b.H 2004
· Repair Work for Rehmat -1, Remat-2, and Mehar-1 Well Sites PETRONAS CARIGALI Pakistan 2004
· Construction of TST Road from Kadanwari –Miano Gas Plant to the Kadanwari Airstrip. OMV G.m.b.H 2004
· Construction of Boundary Wall, Guard Room, Attendant Room, and Road for LPG Storage Area, At Adhi Gas Field Tehsil Gujar Khan, District Rawalpindi Pakistan Petroleum Limited.  Pakistan 2005
· Construction of Access Roads, & Well Location Nara-1 OMV G.m.b.H 2005
· Construction of Access Roads, & Well Location Miano-9 OMV G.m.b.H 2005
· Construction of Access Road, Well Site, Camp Site, and Lowering of Conductor Pipe at Following Locations.

Nara-1, Sawan -6, Sawan-10, Michko-1, Latif-1, Tajjal–1

OMV G.m.b.H 2005-2006
· Construction of Access Road, Well Site, Camp Site, SG Camp at SAQIB-1 and Rehmat III PETRONAS CARIGALI Pakistan 2006-2007
· Provision of Civil Construction Work for Chachar 2 & 3 and Chachar Gas Plant including 3km of blacktop TST road Tullow Pakistan Development Limited 2007
· Restoration of Miano-1 Well Site, Restoration of Sawan-10 Well Site, Restoration of Sawan-6 OMV G.m.b.H 2007
· Construction of 17 Km Access Road, Well Site, Camp Site, and 20” Pipe Culverts. OMV G.m.b.H 2007
· Repair and maintenance of existing Roads at Miano-11 and

Construction of New Access Road

OMV G.m.b.H 2007
· Repair and maintenance of existing Roads at Sawan-11 and

Construction of New Access Road

OMV G.m.b.H 2007
· Repair and maintenance of the existing Road at Sawan-East-1 Construction of New Access Road OMV G.m.b.H 2007
· Restoration of Well site and Camp Site Tajjal -1 OMV G.m.b.H 2007
· Construction of Flare and Water Pit Miano-9 OMV G.m.b.H 2007
· Restoration Well & Camp Site Miano-11 and Tajjal 1 OMV G.m.b.H 2007
· Construction of New Access Road, Construction of Camp Site and Well Site Kohat East -1 Tullow Pakistan Development Limited 2007
· Construction of Flare and Water pits at Miano-9 Miano-2 Khipro-1 Repair and maintenance of existing Road at Sawan-13  and Construction of New Access Road OMV G.m.b.H 2007
· Construction of New Access Road, Construction of Camp Site and Well Site Dinan Shah OMV G.m.b.H 2008
· Construction of New Access Road, Construction of Camp Site and Well Site Latif-2 OMV G.m.b.H 2008
· Construction of New Access Road, Construction of Camp Site and Well Site Tajjal-2 OMV G.m.b.H 2008
· Tajjal-1 Workover for Tajjal -1 Sidetrack for re-drilling OMV G.m.b.H 2008
· Construction of New Access Road, Construction of Camp Site and Well Site Miano-13 OMV G.m.b.H 2008
· Construction of New Access Road, Construction of Camp Site and Well Site Sawan-14 OMV G.m.b.H 2008
· Restoration of Well site Latif -1 OMV G.m.b.H 2008
· Sawan-2 Work Over OMV G.m.b.H 2008
· Construction of New Access Road, Construction of Camp Site and Well Site Tajjal-3 OMV G.m.b.H 2008
· Construction of New Access Road, Construction of Camp Site and Well Site Miano-12&13 OMV G.m.b.H 2008
· Construction of New Access Road, Construction of Camp Site and Well Site Latif-4 OMV G.m.b.H 2008
· Construction of New Access Road, Construction of Camp Site and Well Site Sawan-15 OMV G.m.b.H 2008-2009
· Construction of a New Access Road at K-20 including

Construction of Camp Site and Well Site

Eni Pakistan Ltd 2008-2009
· Restoration of Well siteSawan-14 OMV G.m.b.H 2009
· Construction of Chemical Storage Hall, Excavation of foundation, backfilling, Brick Masonry, PCC Concrete, PCC Flooring, supply and installation of  steel doors, installation of smoke deduction with all safety devices OMV G.m.b.H 2009
· Construction of Muster Point Shed

Grading Backfilling of Area, Excavation and Backfilling, Brick Masonry, PCC Concrete, Steelworks including providing, bolting, and fixing of members, beams, rafters, beams, rafters, plates, and  bolts

OMV G.m.b.H 2009
· Restoration of Well site Sawan-15

 

OMV G.m.b.H 2009
· Construction of prefabricated Fusion Cell in 11th Corp HQ Peshawar in Pre-Feb Structure. The size of the fusion cell was 24’x34’ 11 corps

HQ

Peshawar

2009
· Construction of a Chemical Storage Hall to store different types of Chemical which requires special temperatures. The size of the Lube Storage Hall is 40ft x24ft OMV G.m.b.H 2009
· Construction of New Access Road, Construction of Camp Site and Well Site Latif north-1 OMV G.m.b.H 2009
· Construction of New Access Road, Construction of Camp Site and Well Site Sawan-12 OMV G.m.b.H 2010
· Construction of New Access Road, Construction of Camp Site and Well Site Duljan East -1 OMV G.m.b.H 2010
· Ammunition Storage point for Special Service Group of Pak Army

Construction of Premix carpeted road, construction of 800 feet long causeway wing walls, drain along roadside and pipe culvert at a different portion of the road, stone masonry, etc.

Special Service Group of Pak Army 2010
· Construction of SSG Road and allied works for special services Group of Pak Army

Construction  of Premix Carpeted road, construction of causeway and pipe culverts, stone and brick masonry at a different portion of the road

Special Service Group of Pak Army 2010
· Construction of New Access Road, Construction of Camp Site and Well Site Miano-14 OMV G.m.b.H 2010
· Embankment  protection, providing and filling with boulders to cap the affected  area of Nara Bund at RD 310 of Nara Canal OMV G.m.b.H 2010
· Road & External Cable Network in Camp-2 Sawn.

·          Clearing and marketing of Road, Excavation, filling, compaction of area concerting bitumen coating etc.

·          Supply and installation of 60mm thick tuff pavers

·          Providing and laying of fair face curb stone (300x300x150 mm of the height of 450mm) Excavation, laying /cable pulling, jointing, termination, glanding, and backfilling of cable (F&G, PTCL, PAGA  having Dia of 1.5 mm 2.5mm,6mm,10pair and 20 pair cables) complete in all respect

OMV G.m.b.H 2010
· Incinerator Relocation Project at Kadanwari

·          Lighting column, steel, hot dipped galvanized, 6meter high, single bent arm

·          Roadway lighting pole steel hot dipped galvanized, 6meter high, single bent arm

·          Complete with base plate, nut bolt etc.

·          Installation of flood lighting fixtures type NFMVS IM Y250/240

OMV G.m.b.H 2010
· Construction of New Access Road, Construction of Camp Site and Well Site Tajjal-4 OMV G.m.b.H 2010
· Raising of Sawan Access Road Including Construction of Culvert and Detour OMV G.m.b.H 2011
· Provision and Installation of fence Lighting pole at North East of Kadanwari Camp-1 OMV G.m.b.H 2011
· Provision and installation of low Height fence 4ft.

Provision and installation of 4×6 gate at Kadanwari Camp

OMV G.m.b.H 2011
· Construction of New Access Road, Construction of Camp Site and Well Site Misri Bhamroo-1 OMV G.m.b.H 2011
· Construction of New Access Road, Construction of Camp Site and Well Site Lundo-1 OMV G.m.b.H 2011
· Construction of New Access Road, Construction of Camp Site and Well Site Miano-15 OMV G.m.b.H 2011
· Construction of New Access Road, Construction of Camp Site and Well Site Mehrab-1 OMV G.m.b.H 2012
· Construction of New Access Road, Construction of Camp Site and Well Site Latif-7 OMV G.m.b.H 2012
· Construction of New Access Road, Construction of Camp Site and Well Site Latif-5 OMV G.m.b.H 2013
· Construction of New Access Road, Construction of Camp Site and Well Site Sawan North -1 OMV G.m.b.H 2013
· Construction of New Access Road, Construction of Camp Site and Well Site Tajjal South-1 OMV G.m.b.H 2013
· Construction of New Access Road, Construction of Camp Site and Well Site Latif-9 OMV G.m.b.H 2013
· Construction of New Access Road, Construction of Camp Site and Well Site TRG Miano -16 OMV G.m.b.H 2014
· Construction of Security Guard Building & Parking Shed at Kadanwari Plant. OMV G.m.b.H 2014
· Construction of New Access Road, Construction of Camp Site and Well Site Sawan North-1 OMV G.m.b.H 2014
· Construction of New Access Road, Construction of Camp Site and Well Site Latif-10 OMV G.m.b.H 2014
· Rig Clearance Radius for SNH-1 Workover OMV G.m.b.H 2014
· Construction of Well, and Access Road Kundan-1 Sindh KUFPEC 2015
· Relocation of Civil support foundations from Sawan-12 to Sawan-6

 

OMV G.m.b.H 2015
· Re-modification of Dhurnal-2 Access Road & Well Site. Orient Petroleum Inc 2015
· Construction of Well & Camp Site Sujawal Deep-1

Construction of Well Site Camp Site and Access Road

 

Mari Petroleum Company Limited 2015
· Construction of 4 no. of  Security Pickets for MOL Pakistan at the Central process facility in Karak KPK MOL Pakistan 2016
· Construction of 3RCC Bio Remedial PITS and Fencing around NASHPA #4, Well Site, District Karak KPK OGDCL 2016
· Construction of School Building, Boundary wall, and toilet block In Karkan Baluchistan Mari Petroleum Company Limited 2016
· Construction of Foundation, Earth Work, Construction of Camp Site etc. at Kalabagh. Mari Petroleum Company Limited 2017
· Construction of pre-Engineering Steel Building for RYK Sugar Mills Rahim Yar Khan (Mill House Building) RYK 2017
· Construction of pre-Engineering Steel Building for RYK Sugar Mills Rahim Yar Khan (Power House Building) RYK 2017
· Construction of Well & Camp Site Bolan East -1 Mach Baluchistan Mari Petroleum Company Limited 2018
· Services for detail designing, Supply, Laying, Jointing, Testing & Commissioning of 12″ HDPE Pipeline 2.5 km at BQPS-1 on a TURNKEY basis PR# 1400017634 K-Electric Limited 2018
· Repair and Maintenance of MCR Roads at PARCO-MCR. Mehmood Kot Reference (# 1000030645) PARCO 2018
· Construction of Boundary Wall and Watch Tower at PPL Adhi Field. Pakistan Petroleum Limited 2018
· Supply Fabrication, Installation, and Fixing of Steel Platform of Main Plant Lime Cream Work Shop, Crusher, and Screening at Shinkai/Degan Copper Mining Project total weight is (235 Ton) FWO (Medo) 2018-2019
· Supply, Fabrication, Installation, and Fixing of Conveyor Belt for Steel Structure at Shinkai/Degan Copper Mining Site, NWA FWO (Medo) 2018-2019
· Construction of Boundary Wall and Watch Tower at Shinkai/Degan Copper Mining Site FWO (Medo) 2018-2019
· Construction the of First Floor of Adhi Office block at the Facility Pakistan Petroleum Limited 2019
· PRODUCTION FACILITY AT DHARIAN-1(Mari Petroleum Company Limited) Mari Petroleum Company Limited 2019
· Chemical Decontamination of Toxic Sludge at Sour Water Tank  (810-TK3) Bottom at PARCO-MCR Sour Water Stripping Unit PARCO 2019
· Construction of Well & Camp Site  Access Road, Camp & Well site Latif-18 United Energy 2019
· Civil Foundation of Compressors, Cooler, and Pipe Supports in Zamzama Gas Plant Dadu Orient Petroleum Pty LTD 2019
· Construction of Well & Camp Site Access Road, Camp & Well site Bitro-1 United Energy 2019
· Construction of Foundation for Compressors and Allied equipment at Sujjal Field Mari Petroleum Company Limited 2019
· Construction of Well & Camp Site Access Road, Camp & Well site Latif-23 United Energy 2020
· Construction of Well & Camp Site Access Road, Camp & Well site Latif-22 United Energy 2021
· Construction of Well Location; Main Rig Camp & Access Road at Ratana-5, Jand, Attock, Punjab. Orient Petroleum Pty LTD 2021
· Construction of Well & Camp Site Access Road, Camp & Well site Juggan-1 United Energy 2021
· Construction of Well & Camp Site Access Road, Camp & Well site Mithrau-1 United Energy 2022
· Construction of Well Site Latif -10 Workover Job United Energy 2022
· Dismantling and reconstruction of existing Culvert i/c Concrete, Masonry, Stone, steel, etc., preparation of the area for reconstruction of culvert at the same location, and disposal of dismantled material. Mari Petroleum Company Limited 2022
· Construction of Well Site, Camp Site and Access Road Latif-21 United Energy 2022
Completed

RESTORATION OF DRILLING PITS AT JUGAN-2 WELLHEAD

 

United Energy Pakistan  

June

21,2023 to June 27, 2023

Completed

Latif -07 Wellhead Rig stacking (Washouts Rectification BOQ

United Energy Pakistan June

21,2023 to June 27, 2023

Completed

B&B MOHAR-2 NDL LOCATION (HL-21 2000 HP RIG)

United Energy Pakistan July 1, 2023 to 25 July 2023
Completed

Repair of washouts at different locations of Sawan- Kadanwari- Latif Block

United Energy Pakistan July 26, 2023 to
Completed

Construction of Well Site, Camp Site, and Access Road Sawan Deep-1

United Energy Pakistan August 22, 2023 to September 22, 2023